PQ Basics for Technical Buyers
Core post-quantum migration concepts aligned to VeliKey's Axis control plane and Aegis enforcement model.
Citation-ready summary
- PQ migration should begin with cryptographic inventory and policy segmentation by workload criticality.
- Hybrid rollout patterns reduce migration risk by keeping rollback options while validating performance.
- Control-plane approvals and enforcement-plane telemetry are both required to claim migration readiness.
TL;DR for security leaders
Fund inventory completeness first, then require stage-gated approvals in Axis so each migration phase has explicit owner signoff and rollback criteria.
TL;DR for engineers
Map algorithms to service boundaries, run canaries through Aegis enforcement, and compare latency/error telemetry before changing default policy.
What to baseline first
- Current algorithm usage by service, protocol, and key lifecycle policy.
- Control-plane policy ownership and rollout approval path in Axis.
- Enforcement-plane and rollback behavior under load in Aegis.
- Operational definitions from the glossary.
Terminology alignment
Use glossary definitions for Aegis, Axis, control plane, enforcement plane, rollout receipts, and PQ migration.
Next related reading
Next: algorithm choices and migration strategy • Hybrid transition patterns • Evidence: security controls map • Glossary